Before the contract is signed, Shandong Seenboom will dispatch technicians to conduct a detailed on-site survey, draw up a detailed equipment layout plan and system construction plan, and communicate fully with the client. After the plan is approved, the preparatory work before the start of the project can be completed. After filling out the application for commencement and obtaining approval from the relevant departments of Party A, immediately enter the site for pipeline construction. After the pipeline construction is completed, equipment installation, commissioning, etc. will be carried out. First, Party A should complete the water and electricity supply before the equipment is delivered to the site.AC220VConstruction conditions;......

Before the contract is signed, Shandong Seenboom will dispatch technicians to conduct a detailed on-site survey, draw up a detailed equipment layout plan and system construction plan, and communicate fully with the client. After the plan is approved, the preparatory work before the start of the project can be completed. After filling out the application for commencement and obtaining approval from the relevant departments of Party A, immediately enter the site for pipeline construction. After the pipeline construction is completed, equipment installation, commissioning, etc. will be carried out.

Seenboom underbody scanning system

First, Party A should complete the water and electricity supply before the equipment is delivered to the site.AC 220VConstruction conditions; To ensure that the normal passage and use of the crossing are not affected during the later equipment entry and construction period, it is suggested that the lanes be closed during the construction period. Fencing construction (relevant isolation devices can be set up by the construction party); The road will be opened to traffic only after the construction is completed.

The relevant project engineers of Seenboom shall submit the on-site equipment floor plan, equipment elevation view, construction pipeline diagram, equipment wiring diagram, installation and commissioning instructions and other related materials to the client for review. After the equipment contract is signed, the project engineer of our department, in conjunction with Party A, confirms that the on-site construction environment is qualified. Then, a project commencement letter will be submitted. Upon receiving a written reply from Party A, a relevant construction team will be organized to enter the site for pipeline laying, foundation pit excavation, etc.

Shandong Seenboom isUndercarriage security checkThe drafting units of national industry standards in the field are alsoUndercarriage security checkand Underbody scanningA supplier of technology. We can provideCheckpoint security checkFor the overall solution and key parameters of the project, please feel free to consult Shandong Seenboom!

Scan and install the main image under the vehicle